Microsoft 365 apps we have delivered
Three systems for a leading precast concrete manufacturer in the GCC. Two of them run under a 12-month support contract.
Case studies
01 · Case study
QC Inspection Report System
PDF reports from the production database, secured with Microsoft Entra ID.
- About 4 weeks in 4 phases
- SPFx
- .NET Web API
- Microsoft Entra ID
02 · Case study
PO Online System
12 SharePoint Designer workflows moved to Power Automate in about five weeks.
- About 5 weeks
- React SPFx
- Power Automate
- SharePoint lists
03 · Case study
Overtime Request Approval System
Two-level approval that checks requested overtime against actual hours.
- First version about 4 weeks
- Phase 2: 12 features in about 3 weeks
- SPFx (React)
- Power Automate